Mining Engineering
露天矿电钻机集成调度与协调
Integrated Dispatching and Coordination of Electrical Drill RigsA method for optimizing the operation of electrical drill rigs in open-pit mines by integrating their dispatching and coordination processes using Constraint Programming. / 一种利用约束规划技术优化露天矿电钻机运行的方法,通过集成调度与协调过程。
- Knowledge type
- 实际应用
- First proposed or discovered
- Proposer
- Turkey Farm member
- Creator
- 农场主
- Last updated
- 2026-11-01 21:05:23
Sub-knowledge points
No connected node yet
Higher-order knowledge points
No connected node yet
Main parameters and performance indicators
Constraint Programming: Optimization techniqueElectrical Drill Rigs: EquipmentOpen-Pit Mines: Environment
Open problems
No unresolved problem recorded yet
Related literature
ranked by community starsIntegrated Dispatching and Coordination of Electrical Drill Rigs in Open-Pit Mines: A Constraint Programming ApproachOpen source
Related products and links
No item recorded yet
Creation and modification trail
1 recordsRecord title: Integrated Dispatching and Coordination of Electrical Drill Rigs.
Node update feedback
review required