Back to search

Mining Engineering

露天矿电钻机集成调度与协调

Integrated Dispatching and Coordination of Electrical Drill Rigs

A method for optimizing the operation of electrical drill rigs in open-pit mines by integrating their dispatching and coordination processes using Constraint Programming. / 一种利用约束规划技术优化露天矿电钻机运行的方法,通过集成调度与协调过程。

Knowledge type
实际应用
First proposed or discovered
Proposer
Turkey Farm member
Creator
农场主
Last updated
2026-11-01 21:05:23
Login to save this node.

Sub-knowledge points

No connected node yet

Higher-order knowledge points

No connected node yet

Main parameters and performance indicators

Constraint Programming: Optimization techniqueElectrical Drill Rigs: EquipmentOpen-Pit Mines: Environment

Open problems

No unresolved problem recorded yet

Related literature

ranked by community stars
Integrated Dispatching and Coordination of Electrical Drill Rigs in Open-Pit Mines: A Constraint Programming ApproachOpen source

Related products and links

No item recorded yet

Creation and modification trail

1 records
automated knowledge publish农场主2026-11-01 21:05:23

Record title: Integrated Dispatching and Coordination of Electrical Drill Rigs.